When adding multiple drawings to an RFI I typically separate them with a comma and it forces you to "Add a new Drawing number" which turns into something like " 02-U0252322, 02-F-F00-52-001, and 03-L02-1003-H" added all as one drawing number. It should pull each drawing as a single drawing to add and when a certain character is entered (such as a comma or semi-colon), then the suggested search results should begin showing similar drawing numbers for the next drawing you are in the process of entering.
The suggested results that should appear should also be pulling its suggestions from the file names in the DOCUMENTS tab as opposed to ones you manually enter when "Adding a new drawing" on the RFI entry form.
The 3rd portion of this issue is that there is a limit for the amount of characters that are allowed in both the drawing number and spec section on the entry forms for both RFI's & Submittals. We often come across having to write RFI's that have a broad reach over the entire building or over multiple floors and thus there is a need to be able to add as many Drawing Numbers or Spec Sections without a limited amount of characters
Company | Dynamic Systems, Inc. |
Job Title / Role | Project Manager |
I need it... | 1 month |
Dear Viewpoint Suggestion Box contributor;
We at Viewpoint sincerely thank you for your contribution to Suggestion Box on how we can improve Viewpoint products. While we can’t do everything at once, we rely upon your feedback to help guide the prioritization of our product improvements, and Suggestion Box is a critical tool for us to understand and prioritize our customers’ needs.
Viewpoint reviews Suggestion Box regularly for all of our products and updates statuses, adds comments, and performs various house-keeping (including deleting) as needed to ensure that Suggestion Box is maintained as a productive environment for product enhancements requests.
© 2023 Trimble Inc. All Rights Reserved. Viewpoint®, Vista™, Spectrum®, ProContractor™, Jobpac Connect™, Viewpoint Team™, Viewpoint Analytics™, Viewpoint Field View™, Viewpoint Estimating™, Viewpoint For Projects™, Viewpoint HR Management™, Viewpoint Field Management™, Viewpoint Financial Controls™, Vista Field Service™, Spectrum Service Tech™, ViewpointOne™, ProjectSight® and Trimble Construction One™ are trademarks or registered trademarks of Trimble Inc. or its affiliates in the United States and other countries. Other names and brands may be claimed as the property of others.