Recognize Drawing Revision as newest, not Version

Drawing log should have the option to have the highest Revision number be selected.  Currently, the highest Version is the drawing on top.  If drawings are uploaded out of sequence (ex. new drawings are issued in a Change Notice, and others are issued in Site Instructions), then possibly the most recent revision is not the drawing "on top".  This could also be done by sorting by the Issued Date.

  • Noel Broughton
  • Nov 7 2019
Company Krawford Construction
Job Title / Role Project Manager
I need it... 3 months
  • Attach files
  • jenny seiber commented
    March 07, 2022 17:11

    This is great!

  • Autumn Fanning commented
    September 29, 2021 18:23

    This is CRITICALLY impacting our company. We are a full MEPF subcontractor needing to constantly uploaded mutliple disciplines on hundreds of jobs. Not being able to add an oldrer set without having to delete everything and start over uploading in sequence is drasticially impacting us. We are spending hours on drawings. There needs to be an option to go back and insert an older set and organize it by revisions so that my older set is not on top as the current sheet. Why hasnt this been resolevd yet? We really need this in order to get the fully benefite of VP Team.

  • Leah Walker commented
    September 29, 2021 17:59

    This is IMPARATIVE for the function of the drawings tool! We have hundreds of active projects at a time and if something happens and we have to upload a previous set for any reason (accidentally missed uploading it, etc.) we do not have time to go back and delete sets and re-upload them just to add an older set in the proper order. Especially for companies that are trying to roll out using VP Team within their company (like us), we are having to back into projects. Uploading 5-10 drawing revisions per project is time consuming enough, so when you have to redo it because a set was uploaded out of order it is a huge nightmare. Maybe this is an option during upload of the drawings there is an option of where it falls in the sequence. We can already change the revision number, perhaps the tool just functions to display the drawings based on the revision number, that way we have control of what drawings are displayed as the current set.

Dear Viewpoint Suggestion Box contributor;

We at Viewpoint sincerely thank you for your contribution to Suggestion Box on how we can improve Viewpoint products. While we can’t do everything at once, we rely upon your feedback to help guide the prioritization of our product improvements, and Suggestion Box is a critical tool for us to understand and prioritize our customers’ needs. Viewpoint reviews Suggestion Box regularly for all of our products and updates statuses, adds comments, and performs various house-keeping (including deleting) as needed to ensure that Suggestion Box is maintained as a productive environment for product enhancements requests.

1515 SE Water Avenue, Suite 300, Portland, OR 97214 |  800.333.3197  | Contact Us | Terms of Use | Privacy | Support Policies

© 2023 Trimble Inc. All Rights Reserved. Viewpoint®, Vista™, Spectrum®, ProContractor™, Jobpac Connect™, Viewpoint Team™, Viewpoint Analytics™, Viewpoint Field View™, Viewpoint Estimating™, Viewpoint For Projects™, Viewpoint HR Management™, Viewpoint Field Management™, Viewpoint Financial Controls™, Vista Field Service™, Spectrum Service Tech™, ViewpointOne™, ProjectSight® and Trimble Construction One™ are trademarks or registered trademarks of Trimble Inc. or its affiliates in the United States and other countries. Other names and brands may be claimed as the property of others.